Project Summary At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the successful conclusion of the project. This initiative demonstrates a substantial step forward in the client’s ESG framework, enhancing operational resilience and ensuring measurable reductions in both power usage and carbon emissions. https://socialexpresions.com/story6282149/high-efficiency-400-kw-chiller-installation-secures-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction